Ready to Move vs Under Construction in Gurgaon: 12 Projects Against 63

Table of Contents

▼

In most Indian cities this is a preference question. In Gurugram it is barely a question at all, because the supply is not there.

Of the 88 live projects on our books, 12 are complete and 2 are partially handed over. Sixty-three are under construction and 11 are new launches. So roughly one project in six is something you can walk into, and five in six are a drawing, a hoarding and a date.

That ratio changes the shape of the decision. Elsewhere you weigh a price discount against a wait. Here you first have to find out whether anything finished exists in your budget and your corridor at all — and often it does not.

Everything you can move into today

This is the complete list. Fourteen projects, commercial and residential, across the whole city.

Project Sector Type Price Handed over
Adani M2K Oyster Grande 102 Residential Rs 2.2 – 9.49 Cr Jun 2017
Trehan Iris Broadway 85 Retail Rs 26.67 L onwards Dec 2020
M3M Urbana 67 Retail / office Rs 30 L – 3 Cr Dec 2021
Sobha City 108 Residential Rs 3.18 – 6.81 Cr May 2022
M3M Skywalk 74 Residential Rs 2.1 – 3.75 Cr Dec 2022
AIPL Joy Central 65 Office / shop Rs 49.83 L onwards Dec 2022
M3M SCO 113 113 Commercial Rs 5.2 – 16.7 Cr Jul 2023
Krisumi Waterfall Residences 36A Residential Rs 3.62 – 16.42 Cr Jun 2024
Pitrachaya Dev Luxury Floors 70 Builder floor Rs 1.85 – 2.0 Cr May 2024
Emaar Business District 114 114 Commercial Rs 5.20 – 10.63 Cr Dec 2024
DLF The Grove 54 Residential floor Rs 8.23 – 15.37 Cr Feb 2025
Trump Tower 65 Residential Rs 12.69 – 21.78 Cr Jul 2025
M3M Soulitude 89 Residential Rs 1.44 – 2.38 Cr Partially
Smart World Gems 89 Residential Rs 1.58 – 2.35 Cr Partially

Strip out the five commercial entries and you are left with nine finished or partly finished residential projects in the whole of Gurugram. Two of them are above Rs 8 crore. If your budget is between Rs 4 and Rs 8 crore and you want a completed apartment, the list is short enough to visit in a weekend.

The GST difference, which is larger than most buyers expect

This is the one hard number in the comparison, and it runs the other way from the usual assumption that waiting is cheaper.

A completed property with its occupation certificate attracts no GST. An under-construction residential one attracts 5 per cent without input tax credit, or 1 per cent in the affordable category. Under-construction commercial property is a different regime again, at 12 per cent.

On a Rs 3.5 crore under-construction flat, that 5 per cent is about Rs 17.5 lakh you do not pay on an equivalent finished one. It is not a discount the developer can negotiate away, and it does not appear on the price list you are handed.

Two things it does not mean. First, the finished flat is usually priced higher to begin with, and often the premium exceeds the tax saving — you have to run the comparison on the total outflow, not on the tax line alone. Second, stamp duty and registration apply either way: 7 per cent for a male buyer or 5 per cent for a female buyer on the higher of price or collector rate, plus registration on the slab. The collector rates were revised upward from 1 April 2026 by roughly 15 to 30 per cent depending on the pocket, with steeper increases in some. Our property registry charges guide has the schedule, and ready to move flats in Gurgaon works through the tax position in full.

Sobha City, Sector 108 Gurgaon - ready to move 3 and 4 BHK apartments of 1,381 to 2,963 sq ft on the Dwarka Expressway, handed over May 2022
Sobha City, Sector 108 — handed over in May 2022 and one of only nine finished or partly finished residential projects on our books.

The cost nobody puts in the spreadsheet: paying twice

If you are living in rented accommodation while your flat is built, you are paying rent and servicing the loan on a home you cannot use. Pre-EMI on the disbursed portion starts as construction milestones are met, not on possession.

Take a Rs 3.5 crore purchase with a 2031 handover. Five years of rent on a comparable flat, plus five years of pre-EMI on a progressively disbursed loan, is a number that routinely runs into tens of lakhs — and none of it buys equity. The finished flat costs more on day one and stops the double payment immediately.

There is a tax dimension too, and it is unhelpful. Interest paid during construction is not deductible in the year you pay it; it is aggregated and claimed in five equal instalments starting from the year of completion, and the self-occupied cap applies to the total. So the years when your cash outflow is highest are the years you get the least relief. Our home loan guide for Gurgaon property covers the mechanics, and rent versus buy in Gurgaon runs the full comparison for a city where almost nothing is finished.

What the wait actually buys you

It would be dishonest to present this as one-sided. Buying under construction has real advantages, and for many buyers here they win.

  • You can afford it. A construction-linked plan spreads the payment over years. For most buyers this is not an optimisation, it is the only route to a Gurugram home at all.
  • Choice of unit. Floor, tower, aspect and view are available at launch and gone by completion. In a finished project you take what is left.
  • Price, sometimes. An early-stage project is usually cheaper per square foot than a finished one in the same corridor — though not always by enough to cover the GST plus the rent plus the risk.
  • Supply. Bluntly, this is where the stock is. Sixty-three projects against twelve. If you want a specific corridor, a specific configuration and a specific budget, the finished market may simply not contain it.
  • RERA protections. A registered under-construction project comes with a defined completion date, a five-year defect liability period, escrow requirements on collections and a route to compensation for delay. A resale flat gives you none of that.

The risk, measured on our own data rather than in the abstract

"Construction risk" is easy to nod along to and hard to feel. Here is what it looks like on the same 88 projects:

  • Four projects carry possession dates that have already passed while still marked under construction — Ganga Valley (Mar 2026), M3M Capital (Jun 2026), M3M Altitude (Jun 2026) and Nitara One Good Earth (Dec 2025). Those dates have slipped.
  • Thirty-two projects are dated 2031 or later, and sixteen of those are 2032. A date that far out describes intent.
  • Two active projects carry no RERA number at all on our records, which removes the protections above entirely.

The market-wide picture points the same way. Knight Frank India put unsold inventory across eight major markets at roughly 525,695 units at the end of H1 2026, up about 4 per cent year on year, with the Rs 2–5 crore band rising about 43 per cent to roughly 65,671 units. Rising unsold stock in the band where most Gurugram launches sit is a reason to negotiate — and a reason to check the developer's balance sheet, because a project that is not selling is a project whose construction can slow.

Krisumi Waterfall Residences, Sector 36A Gurgaon - ready to move apartments of 1,448 to 6,353 sq ft handed over June 2024
Krisumi Waterfall Residences, Sector 36A — handed over in June 2024, and one of the few completed projects offering a wide range of unit sizes.

Side by side

  Ready to move Under construction
Available in Gurgaon 12 complete, 2 partial 63, plus 11 new launches
GST Nil with occupation certificate 5% residential, 1% affordable, 12% commercial
Stamp duty 7% male / 5% female buyer, on the higher of price or collector rate Identical — no difference either way
Payment Full amount up front Staged over the build
Rent while waiting None Rent plus pre-EMI, often for years
What you inspect The actual flat A sample flat and a drawing
Unit choice Whatever is unsold Floor, tower and aspect
Delay risk None Real — four dates on our books have already slipped
RERA cover Limited; defect liability may remain Full, if registered
Rental income Immediately On possession

How to decide, in order

  1. Check whether a finished option exists in your budget and corridor. Nine residential projects city-wide. This step often ends the debate on its own.
  2. Compare total outflow, not headline price. Finished price against under-construction price plus GST plus rent plus pre-EMI over the wait.
  3. If you are buying to let, weigh the years of lost rent. A 2032 handover is six years of no income. Our rental yield guide has the numbers by corridor.
  4. If you buy under construction, verify rather than trust. Read the RERA registration and the registered completion date on the HARERA portal — not the brochure date. Read the Quarterly Progress Reports, which Haryana promoters must upload with photographs; a project whose QPRs have gone quiet is telling you something. HARERA has also been withholding fresh licences from developers with delayed projects, so a developer's track record is checkable.
  5. If you buy ready, inspect properly. Occupation certificate, maintenance dues cleared, the actual flat rather than the sample, and a conversation with a resident about what the building costs to run. The documents checklist covers the rest.

Neither answer is right for everyone. But in Gurugram specifically, the honest framing is not "should I wait to save money" — it is "can I find a finished home at all, and if not, what am I really being asked to fund." Our possession timeline for 2026 to 2033 shows when the current pipeline is actually due to land.

Frequently Asked Questions

Everything you need to know about this topic.

Twelve of the 88 live projects on our books are complete and two more are partially handed over. Five of the twelve are commercial, so the finished residential market is nine projects city-wide: Adani M2K Oyster Grande, Sobha City, M3M Skywalk, Krisumi Waterfall Residences, Pitrachaya Dev Luxury Floors, DLF The Grove, Trump Tower, and the partially handed over M3M Soulitude and Smart World Gems. Sixty-three projects are under construction and eleven are new launches.
No. A completed property that has received its occupation certificate attracts no GST. An under-construction residential property attracts 5 per cent without input tax credit, or 1 per cent in the affordable category, and under-construction commercial property attracts 12 per cent. On a Rs 3.5 crore flat, that 5 per cent is about Rs 17.5 lakh. Stamp duty and registration apply either way at 7 per cent for a male buyer or 5 per cent for a female buyer, calculated on the higher of price or collector rate.
On headline price usually yes, on total outflow often not. Against the lower price you have to set 5 per cent GST, and the cost of paying rent while also servicing pre-EMI on the disbursed portion of your loan - which on a 2031 handover means about five years of double payment that buys no equity. Interest paid during construction is also not deductible in the year you pay it; it is claimed in five equal instalments from the year of completion. Run the comparison on total outflow over the full period, not on the price list.
Delay, principally, and it is measurable on our own records. Four live projects carry possession dates that have already passed while still marked under construction: Ganga Valley dated March 2026, M3M Capital and M3M Altitude dated June 2026, and Nitara One Good Earth dated December 2025. Thirty-two projects are dated 2031 or later, sixteen of them in 2032. Two active projects carry no RERA registration number at all, which removes the statutory protections entirely.
Take the RERA registration number and look it up on the Haryana RERA portal, then read the registered completion date rather than the date in the brochure - they are frequently different. Then read the project's Quarterly Progress Reports, which Haryana promoters are required to upload with photographs; a project whose QPRs have stopped being updated is telling you something the sales office will not. HARERA has also been withholding fresh licences from developers with delayed projects, so a developer's delivery record is checkable rather than a matter of reputation.
For rental income, ready wins outright - a 2032 handover is six years of no income, and our rental yield guide has the corridor-by-corridor numbers. For capital appreciation the under-construction argument is that you buy earlier and cheaper, but that depends on the project completing on schedule and on the market absorbing the resale coming back before possession. Knight Frank put unsold inventory across eight markets at roughly 525,695 units at the end of H1 2026, with the Rs 2-5 crore band up about 43 per cent - which is where most Gurgaon launches sit.
Ask for the occupation certificate, confirm outstanding maintenance dues are cleared by the seller, and inspect the actual flat rather than a sample - check water pressure, the light in each room at the time of day you will use it, seepage marks on ceilings and around windows, and the lift and common areas three years into use. Talk to a resident about what maintenance really costs and whether the promised club and landscaping were delivered. On a resale, have a lawyer read the title chain and confirm there is no outstanding mortgage.